
Progress at last - 6 tiles on the wall, but whilst rotating this image I just couldn't resist some e-tiling, and look at the results - in just two minutes I've got the other 1/2 of the wall done!
Other progress you might not notice is all the electrics looms are in - lighting and fan - and only two more underfloor connectons to make (shower waste and toilet supply) to make before I can tomb the floor. My e-tiling has obscured the neat job of the shower plumbing (professional plumber).
Next jobs - continue r-tiling (reality), a little more plastering to do and work out how to fill a 3cm gap in the ceiling (plasterboard is 1.8m and room is 1.83 - oh dear)
Kindest to all
D
No comments:
Post a Comment