... so this blog hasn't really been 'progress' has it - there have been loads of stages in between, but fininshing at 2 or 3am just meant I was so tired I couln't gather the strength to take pictures and blog.
BUT - finally, we are a two-utility items family with two of shower, toilet and sink, though the sink hot tap still needs plugging in. Note I hate plumming - hence the extra long flexi tape connectors. I think the last blog only had 6 tiles on - this image shows the majority of the tiling complete - and the toilet, shower and sink working fine.
Nite nite ...
D
Monday, 7 June 2010
Subscribe to:
Posts (Atom)